100% Pass Guaranteed Free C_TS422_2020 Exam Dumps May 02, 2022 Verified Latest C_TS422_2020 Dump Q As with Correct Answers SAP S/4HANA Production Planning and Manufacturing Certification Exam Topics: Topic AreasTopic Details, Courses, BooksWeightingMaterial Requirements Planning in SAP S/4HANASelect and apply planning strategies, use the planning table, characterize long-term planning and master production [...]

100% Pass Guaranteed Free C_TS422_2020 Exam Dumps May 02, 2022 [Q30-Q47]

Share

100% Pass Guaranteed Free C_TS422_2020 Exam Dumps May 02, 2022

Verified & Latest C_TS422_2020 Dump Q&As with Correct Answers


SAP S/4HANA Production Planning and Manufacturing Certification Exam Topics:

Topic AreasTopic Details, Courses, BooksWeighting
Material Requirements Planning in SAP S/4HANASelect and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4220 (SAP S/4HANA 2020)

8% - 12%
Advanced Planning in SAP S/4HANAOutline the basics and master data of advanced planning, explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts

TS421, TS422 (SAP S/4HANA 2020)
OR
S4220 (SAP S/4HANA 2020)

> 12%
Introduction to SAP S/4HANA Production PlanningOutline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4220 (SAP S/4HANA 2020)

< 8%
Capacity Planning in SAP S/4HANAOutline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4230 (SAP S/4HANA 2020)

8% - 12%
Process Orders in SAP S/4HANACharacterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP).

TS421, TS422 (SAP S/4HANA 2020)
OR
S4200 (SAP S/4HANA 2020)

< 8%

 

NEW QUESTION 30
How can SAP S/4HANA support a GMP compliant production process? Note: There are 3 correct answers tothis question.

  • A. Use of the digital signature function to check and run business processes
  • B. Predefined GMP compliant process order types to meet audit requirements
  • C. Use of the GMP compliant flag in relevant master data applications
  • D. Recipe approval (with Engineering Change Management)
  • E. Documentation of quality data with Quality Management

Answer: A,D,E

 

NEW QUESTION 31
A planner updated a production order status from partially confirmed "PCNF"to technically completed "TECO" by mistake.
What impact would this have to other users for this specific production order?

  • A. The production manager can still see the capacity requirements
  • B. The buyer can still see component reservations
  • C. The warehouse clerk still carry out goods issue transactions
  • D. The production operator cannot enter additional confirmations

Answer: D

 

NEW QUESTION 32
What are examples of assignment objects you can maintain in the Engineering Workbench?
There are 3 correct answers to this question.

  • A. Routing to sequence assignment
  • B. Material to routing assignment
  • C. Material to bill of materials (BOM) assignment
  • D. Material to production version assignment
  • E. Component assignment

Answer: B,C,E

 

NEW QUESTION 33
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings? Please choose the correct answer.

  • A. Plant Settings -> MRP Group -> Material Master
  • B. MRP Group -> Material Master -> Plant Settings
  • C. Material Master -> MRP Group -> Plant Settings
  • D. Material Master -> Plant Settings -> MRP Group

Answer: C

 

NEW QUESTION 34
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA.
When can you use mode selection?

  • A. When multiple planned orders exists in one resource
  • B. When multiple operations are maintained for one product
  • C. When alternate resources are used within one operation
  • D. When multiple production versions are maintained for one product

Answer: C

 

NEW QUESTION 35
What are some of the advantages of using Kanban? There are 2 correct answers to this question.

  • A. Replenishments are based on centralized planning
  • B. Replenishments are created close to the actual need
  • C. It is a simplified form of production control
  • D. It is mostly accomplished by manual postings

Answer: B,C

 

NEW QUESTION 36
Which master data object governs the relationship between supply source and demand source in the Kanban process?

  • A. Replenishment strategy
  • B. Rate routing
  • C. Production supply area
  • D. Control cycle

Answer: D

 

NEW QUESTION 37
You have maintained the parameters for simple discontinuation the material master of a component. Which business process will be affected if the available stockis zero and the discontinuation date is in the past?

  • A. Kanban
  • B. Back flushing
  • C. Material requirements planning
  • D. Production order release

Answer: C

 

NEW QUESTION 38
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?

  • A. Squeezing
  • B. Insert operation
  • C. Find Slot
  • D. Scheduling working time only

Answer: C

 

NEW QUESTION 39
You want to triggering-houseproduction of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

  • A. Make-to-order production (20)
  • B. Planning without final assembly (50)
  • C. Planning at assembly level (70)
  • D. Planning with final assembly (40)

Answer: B

 

NEW QUESTION 40
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?

  • A. The plant-specific status
  • B. The cross-plant status
  • C. The least restrictive status
  • D. The most restrictive status

Answer: D

 

NEW QUESTION 41
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? There are 3 correct answers to this question.

  • A. Reduction of associated capacity requirements
  • B. Material staging for next order in sequence
  • C. Posting of goods receipt for the product
  • D. Posting of production costs to the production cost collector
  • E. Archiving of documents for assembly scrap

Answer: A,C,D

 

NEW QUESTION 42
What does it mean for the production planner when MRP works with infinite capacities?

  • A. MRP creates capacity requirements only if the work center has sufficient capacity.
  • B. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
  • C. MRP creates capacity requirements without checking the capacity of a work center.
  • D. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.

Answer: C

 

NEW QUESTION 43
You want to create a production order from a planned order. What methods could you use? Note: There are 2 correct answers to this question.

  • A. Partial conversion
  • B. Full conversion
  • C. Individualconversion
  • D. Order release

Answer: A,B

 

NEW QUESTION 44
What data can you maintain in the sub items of a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. Scrap percentage
  • B. Installation point
  • C. Item type
  • D. Quantity

Answer: B,D

 

NEW QUESTION 45
What are the consequences if operation status Dispatched is set for a production order operation?

  • A. You can reschedule the operation using finite Scheduling in a planning board.
  • B. You canreschedule the order using material requirements planning.
  • C. You can reschedule the operation using lead the scheduling.
  • D. You can reschedule the order using lead time scheduling.

Answer: A

 

NEW QUESTION 46
How would you define pegging in the context of Advanced Planning?

  • A. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run.
  • B. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements.
  • C. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements.
  • D. An evaluation to verify if there are mater al or capacity shortages in the network after the production planning run.

Answer: B

 

NEW QUESTION 47
......

Latest C_TS422_2020 dumps - Instant Download PDF: https://lead2pass.guidetorrent.com/C_TS422_2020-dumps-questions.html