Congratulations on deciding to pursue the E-S4HCON2019 certification — a challenging credential that more and more IT professionals now treat as an industry benchmark — and welcome to GuideTorrent, where 45 practice questions for the E-S4HCON2019 exam come with verified answers and a price that respects your budget.
SAP E-S4HCON2019 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: SAP System Upgrade Procedures | 12% - 20% | - Upgrade execution
|
| Topic 2: Preparing for an SAP S/4HANA Conversion | 12% - 20% | - Maintenance Planner
|
| Topic 3: Downtime Optimization | 8% - 12% | - Downtime reduction techniques
|
| Topic 4: SAP System Landscape Conversion | 8% - 12% | - Landscape considerations
|
| Topic 5: Monitoring and Troubleshooting | 8% - 12% | - Issue analysis
|
| Topic 6: Manual Activities During Conversion and Upgrade | 8% - 12% | - Modification adjustment
|
| Topic 7: Post-Processing Activities | Below 8% | - Follow-up tasks
|
| Topic 8: Executing an SAP S/4HANA Conversion with SUM and DMO | 12% - 20% | - Software Update Manager (SUM)
|
E-S4HCON2019 Exam Facts for Careful Buyers
- Preparing for an SAP S/4HANA Conversion (12% - 20%)
- SAP System Upgrade Procedures (12% - 20%)
- Post-Processing Activities (Below 8%)
SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Sample Questions:
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:
- A. Downtime migration (EU_CLONE_MIG_DT_RUN)
- B. Uptime migration (EU_CLONE_MIG_UT_RUN)
- C. Shadow repository creation (EU_IMPORT*)
- D. ParaUel distribution (PARDIST_SHD)
Correct Answer: B 🗳️
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
Response:
- A. Import of dictionary objects from the download directory in phase DDIC_UPG
- B. Activation of dictionary objects in phase ACT_UPG
- C. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
- D. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
- E. Import of upgrade and language data from the download directory in phase TABIM UPG
Correct Answer: A,B,E 🗳️
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.
- A. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.
- B. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.
- C. The transport between Unicode and non-Unicode systems is forbidden.
- D. The upgrade of the PRD must be finished before you start new development in the DEV.
Correct Answer: B 🗳️
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.
- A. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.
- B. You need to build up a SI check framework by applying SAP notes.
- C. Depending on the SAP S/4HANA version, there are different SI check frameworks.
- D. The SI checks are executed in the development system and the results are transported into the subsequent systems.
Correct Answer: B,C 🗳️
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:
- A. SWPM using the Backup / Restore procedure
- B. SUM without DMO
- C. SWPM using the Load procedure
- D. SUM with DMO
Correct Answer: C 🗳️
Viewing page 1 out of 9 pages.
Viewing questions 1-5 out of 45 questions.


